Different contracts in their different modalities, from face-to-face, with action in two hours, action in 24 hours, preventive or corrective. At present there are more than twenty industrial type contracts, some of the conductive type with assistance in less than 24 hours. and about thirty corrective measures with the same attendance time.
General Services, Maintenance
31 de October de 2024
30 de October de 2024