{"id":1864,"date":"2025-12-01T09:04:29","date_gmt":"2025-12-01T09:04:29","guid":{"rendered":"https:\/\/www.ingeainstalaciones.com\/?p=1864"},"modified":"2025-12-01T09:07:15","modified_gmt":"2025-12-01T09:07:15","slug":"juzgados-de-plaza-castilla-madrid","status":"publish","type":"post","link":"https:\/\/www.ingeainstalaciones.com\/en\/juzgados-de-plaza-castilla-madrid\/","title":{"rendered":"<p>Juzgados de Plaza Castilla, Madrid.<\/p>"},"content":{"rendered":"<p>INGEA, S.A. ha entregado con &eacute;xito la auditor&iacute;a y posterior rehabilitaci&oacute;n integral de las instalaciones de Climatizaci&oacute;n, Ventilaci&oacute;n y Control del edificio de los Juzgados de Plaza Castilla, Madrid.<p><\/p><div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"378\" height=\"252\" src=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/2-2.jpg\" alt=\"\" class=\"wp-image-1879\" style=\"width:687px;height:auto\" srcset=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/2-2.jpg 378w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/2-2-300x200.jpg 300w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/2-2-18x12.jpg 18w\" sizes=\"auto, (max-width: 378px) 100vw, 378px\"><\/figure>\n<\/div><figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"390\" height=\"584\" src=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/1-2.jpg\" alt=\"\" class=\"wp-image-1878\" style=\"width:311px;height:auto\" srcset=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/1-2.jpg 390w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/1-2-200x300.jpg 200w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/1-2-8x12.jpg 8w\" sizes=\"auto, (max-width: 390px) 100vw, 390px\"><\/figure><p><\/p><p>Se encomend&oacute; a Ingea el reto de la auditoria t&eacute;cnica y posterior reparaci&oacute;n para dejar en servicio las instalaciones de HVAC. Ha sido necesaria la sustituci&oacute;n de bombas, de partes de torres de refrigeraci&oacute;n, de ventiladores, modificaci&oacute;n de colectores, cambio de todas las instalaciones de control, cambio de v&aacute;lvulas de control en fancoils y climatizadores, su ajuste hidr&oacute;nico y dem&aacute;s trabajos necesarios para dejar en servicio las instalaciones de climatizaci&oacute;n y ventilaci&oacute;n del edificio. Este trabajo se ha ejecutado con el edificio en uso, con trabajos nocturnos y en festivos.<\/p><p><\/p><div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"753\" height=\"424\" src=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/4-1.jpg\" alt=\"\" class=\"wp-image-1874\" style=\"width:490px;height:auto\" srcset=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/4-1.jpg 753w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/4-1-300x169.jpg 300w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/4-1-18x10.jpg 18w\" sizes=\"auto, (max-width: 753px) 100vw, 753px\"><\/figure>\n<\/div><figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"759\" height=\"427\" src=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/3-1.jpg\" alt=\"\" class=\"wp-image-1873\" style=\"width:509px;height:auto\" srcset=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/3-1.jpg 759w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/3-1-300x169.jpg 300w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/3-1-18x10.jpg 18w\" sizes=\"auto, (max-width: 759px) 100vw, 759px\"><\/figure><p><\/p><p>A toda esta complejidad de ejecuci&oacute;n se ha sumado que el edificio tiene una antig&uuml;edad de mas de treinta a&ntilde;os, que los trabajos se han ejecutado en ocho semanas, seis de ejecuci&oacute;n y que se han realizado suministros en el d&iacute;a a d&iacute;a.<\/p><p><\/p><div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"756\" height=\"425\" src=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/5-1.jpg\" alt=\"\" class=\"wp-image-1875\" style=\"width:492px;height:auto\" srcset=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/5-1.jpg 756w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/5-1-300x169.jpg 300w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/5-1-18x10.jpg 18w\" sizes=\"auto, (max-width: 756px) 100vw, 756px\"><\/figure>\n<\/div><figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"755\" height=\"425\" src=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/6-1.jpg\" alt=\"\" class=\"wp-image-1876\" style=\"width:507px;height:auto\" srcset=\"https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/6-1.jpg 755w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/6-1-300x169.jpg 300w, https:\/\/www.ingeainstalaciones.com\/wp-content\/uploads\/2025\/12\/6-1-18x10.jpg 18w\" sizes=\"auto, (max-width: 755px) 100vw, 755px\"><\/figure><p><\/p><p>Agradecemos a todo el equipo de compras, producci&oacute;n, oficina t&eacute;cnica, jefes de obra, colaboradores, proveedores y fabricantes, el esfuerzo realizado para terminar con &eacute;xito este reto.<\/p><\/p>","protected":false},"excerpt":{"rendered":"<p>INGEA, S.A. ha entregado con &eacute;xito la auditor&iacute;a y posterior rehabilitaci&oacute;n integral de las instalaciones de Climatizaci&oacute;n, Ventilaci&oacute;n y Control del edificio de los Juzgados de Plaza Castilla, Madrid. Se encomend&oacute; a Ingea el reto de la auditoria t&eacute;cnica y posterior reparaci&oacute;n para dejar en servicio las instalaciones de HVAC. Ha sido necesaria la sustituci&oacute;n &hellip;<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.ingeainstalaciones.com\/en\/juzgados-de-plaza-castilla-madrid\/\"> <span class=\"screen-reader-text\">Juzgados de Plaza Castilla, Madrid.<\/span> Read More &raquo;<\/a><\/p><\/p>","protected":false},"author":4,"featured_media":1872,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-1864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"_links":{"self":[{"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/posts\/1864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/comments?post=1864"}],"version-history":[{"count":2,"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/posts\/1864\/revisions"}],"predecessor-version":[{"id":1881,"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/posts\/1864\/revisions\/1881"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/media\/1872"}],"wp:attachment":[{"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/media?parent=1864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/categories?post=1864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingeainstalaciones.com\/en\/wp-json\/wp\/v2\/tags?post=1864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}